01386 861961
If you've seen something that you like, then get in touch for a log cabin quote. You can fill in our form, phone, fax, email or write to us. All the details are below -
01386 861961 (or fax)
Placing your order
A deposit of 20% is required at the time of order. You will receive an order confirmation, deposit invoice, plus a "What Happens Next" letter, a timetable of events, insulation fitting instructions (if applicable) & preservative treatment information.
An invoice for the balance of payment will be sent to you approximately 2 weeks prior to your cabin delivery.
Our normal opening hours are Monday to Friday, 9.00am to 5.00pm. We are able to make arrangements outside of the above mentioned hours and at weekends, however, in ALL cases, visits are by appointment only so that we can allocate a member of staff to be present to devote adequate time to our visiting customers.
Bearing in mind that most of our cabins are being made fresh especially for you to your design requirements, we need a sensible time frame in which to process the order, design, schedule production, source correct high grades of raw materials, manufacture, package and transport.
This is reliably achieved in 6 weeks on average.
more on delivery time
All of our delivery lorries are equipped with Moffat Mounty / Kooi fork lift trucks on board.
These are incredibly versatile machines, that allow the driver to offload the cabin packs from the side of the lorry, travel a short distance and place the pack as close to your build site as is possible.
more on delivery
We do offer an efficient installation service nationwide, although the majority of our customers take enjoyment from self assembly and we are available 24/7 to provide expert advice over the telephone should the need arise.
Installation details
Search by Cabin Width
Search by Cabin Depth
Read our Keops testimonials. See what our customers really think of us!
.
Customer Gallery

Let our customer gallery inspire you! See the many uses & interiors of our Interlock log cabins. From summer houses, offices & gyms to fishing lodges, snooker rooms & garages...
view gallery
Madresfield Early Years Centre
Madresfield Early Years Centre in Worcestershire is a private school set in a 200 acre farm with beautifully converted farm buildings providing immense and fabulous accommodation for some 170 children. The School has had outstanding OFSTED reports and its success has been noted in Whitehall and it has in part been opened by Her Majesty Queen Elizabeth II.


The appointed Architect came to Keops Interlock in search of a tailor made log cabin for a proposed new, baby and toddler unit.
The design was for a log cabin 11.5m wide x 14m long (160 sq.m) specifically sized to locate within a space between existing buildings.
Mrs. Bennett the Proprietress had a very positive vision for the internal layout and important features to be included.
Briefly, the central area was to be the main cot room for 11 cots and the main corridors would allow an orbital flow around the central feature, leading to two large adjacent halls, one for babies, one for toddlers. The Halls needed provision for linking into one for other functions. It was also important that the halls should have a wide expanse of glazing to take advantage of the glorious views to the Malvern Hills beyond, so that the children could watch the activities of the working farm and the movement of livestock.
The corridors serviced some 12 other rooms including reception, cloakroom, office, quiet room, dining area, kitchen, utility room, staff room, toddler changing, toddler stores, baby changing, baby store and disabled toilet.
Above the central area, two enormous lofts were created for storage of all the toys and equipment.
The log cabin was delivered in component form some 8 weeks from order on exactly the day promised and construction work on site was substantially complete within 10 days also as promised.
The log cabin was subjected to building regulations approval for a commercial building and therefore included the Keops system of roof and floor insulation, the log cabin cavity wall system with rigid ureathane insulation cavity fill and Keops door and window system in UPVC golden oak frames with 24mm double glazed Pilkington Low E toughened glass. Four large Velux units were added to provide additional light over the halls and dining area.
Several rooms had stable doors and in general were designed for disabled access width with low profile sills for push chairs.
Another Community Recreation Project Committee has recently visited to appraise our quality and ability. We are excited at the prospect of their order shortly once their planning permission is finalised.
Search by Cabin Name
press enter
